|
Product Detail :
|
Construction of 6 Lane Access Controlled Amaravati Outer Ring Road from Nandigama to Davuluru on Hybrid Annuity Mode in the state of Andhra Pradesh. Package 2 (from Design Km.27.000 to Km.83.000).
|
| Tender Detail : |
Construction of 6 Lane Access Controlled Amaravati Outer Ring Road from Nandigama to Davuluru on Hybrid Annuity Mode in the state of Andhra Pradesh. Package 2 (from Design Km.27.000 to Km.83.000). #*. Construction of 6 Lane Access Controlled Amaravati Outer Ring Road from Nandigama to Davuluru on Hybrid Annuity Mode in the state of Andhra Pradesh. Package 2 (from Design Km.27.000 to Km.83.000). |