Product Detail :
|
Tender invited for 2024-25 (Ami No.Sn 219) Cytocentrfuge Specifications 1. The Equipment Should Be Bench Top Centrifuge For Cytology Specimens. 2. It Should Be Capable Of Thin Layer Cell Preparation Forretrieving Cells From Various Body Fluids & Preserving Their Morphology. 3. It Should Be Capable Of Processing Up To Minimum 8 Specimens At One Time. 4. It Should Be Resistant To Fluid Spillage And Also Closed Rotor, Chambers For Elimination Of Aerosol. 5. Inbuilt Safety Alarms During All Stages Of Operation Should Be Available. 6. Microprocessor Based Controls & Programming For Time And Speed 7. Voltage Requirement 220V, 50Hz. 8. Rpm Should Be 200-2000 9. Cell Block Preparation System Should Be Present Inthe System. 10. Should Have Digital Display For Speed And Time. 11. Time Window Displays The Programmed And Remaining Run Time From 1-99 Minutes. 12. Essential Accessories Like 200 Filter Cards. Cyctoclips, Reusable Funnels (10) Etc To Be Supplied With The System. 13. Document Supporting Track Record And Satisfactory Performance In Govt./ Semi - Govt./ Psu. Total Installations Should Be More Than 50, Andminimum 5 Performance Certificates From Verified From Govt./ Semi - Govt./ Psu Institutes. 14. Equipment Should Be Us - Fda, European Ce And Bis /Iso Approved. 15. Two Year Warranty Should Be Provided For All Components. 16. Year Wise Breakup Of Cmc Charges (For All Components) For A Period Of 5 Years After Completion Of Warranty Period Should Be Mentioned As Per The Following Requirement A) Preve
|
Tender Detail : |
2024-25 (ami No.sn 219) Cytocentrfuge (as Per Attached Specifications) .#* 2024-25 (ami No.sn 219) Cytocentrfuge Specifications 1. the Equipment Should B
e Bench Top Centrifuge for Cytology Specimens. 2. It Should Be Capable of Thin Layer Cell Preparation For
retrieving Cells From Various Body Fluids & Preserving Their Morphology. 3. It Should Be Capable of Proc
essing Up to Minimum 8 Specimens at One Time. 4. It Should Be Resistant to Fluid Spillage and Also Close
d Rotor, Chambers for Elimination of Aerosol. 5. Inbuilt Safety Alarms During All Stages of Operation Shou
ld Be Available. 6. Microprocessor Based Controls & Programming for Time and Speed 7. Voltage Requir
ement : 220v, 50hz. 8. Rpm Should Be 200-2000 9. Cell Block Preparation System Should Be Present In
the System. 10. Should Have Digital Display for Speed and Time. 11. Time Window Displays the Program
med and Remaining Run Time From 1-99 Minutes. 12. Essential Accessories Like 200 Filter Cards. Cyctocli
ps, Reusable Funnels (10) Etc to Be Supplied with the System. 13. Document Supporting Track Record An
d Satisfactory Performance in Govt./ Semi - Govt./ Psu. Total Installations Should Be More Than 50, And
minimum 5 Performance Certificates From Verified From Govt./ Semi - Govt./ Psu Institutes. 14. Equipm
ent Should Be Us - Fda, European Ce and Bis /iso Approved. 15. Two Year Warranty Should Be Provide
d for All Components. 16. Year Wise Breakup of Cmc Charges (for All Components) for a Period of 5 Year
s After Completion of Warranty Period Should Be Mentioned as Per the Following Requirement: A) Preve
ntive Maintenance Visits 4 Times in a Year. B) Breakdown Calls as and When Required. C) Maximum Resp
onse Time: 2 Days. D) Maximum Downtime: 3 Days. E) in Case of Downtime Exceeding Beyond 72 Hours
, Similar Make & Model Backup/standby Equipment Using Same Inventory as the Main Equipment Shou
d Be Provided. F) List of Items That Are Not Covered Under Cmc Should Be Provided with Their Rates & P
eriodicity Or Schedule of Replacement. Anything Not Mentioned in the List Has to Be Supplied Free ] |